Fall HVAC preparation is not simply a matter of replacing filters and confirming that the boilers start. For a commercial facility, the seasonal changeover is an opportunity to validate heating capacity, ventilation performance, pressure relationships, control sequences, heat-recovery operation, freeze protection, filtration, and indoor air quality under conditions that may be substantially different from summer operation.



A technically sound fall readiness program should produce measurable evidence that the system can:

  • Maintain heating setpoints at design or near-design conditions

  • Deliver scheduled outdoor airflow to each occupied zone

  • Control space humidity without creating condensation or excessive dryness

  • Maintain required building and room pressure relationships

  • Limit particulate and gaseous contaminant concentrations

  • Operate without avoidable simultaneous heating and cooling

  • Protect coils, piping, drains, and outdoor-air equipment from freezing

  • Communicate alarms, sensor failures, and air-cleaner status to the building automation system

  • Transition into elevated air-cleaning modes when required


ASHRAE Standard 62.1 addresses ventilation and acceptable IAQ in commercial buildings, including requirements related to filtration, controls, air cleaning, operation, and maintenance. The current 2025 edition adds provisions affecting humidity control, air-density adjustments, demand-control ventilation sequences, emergency ventilation control, separation distances, and filter efficiency. The adopted edition, however, depends on the project jurisdiction and applicable mechanical code.


1. Start with the Basis of Design, Not the Maintenance Checklist

Before inspecting equipment, review the building’s design and operating criteria. At minimum, collect:

  • HVAC schedules and equipment submittals

  • Sequence of operations

  • Testing, adjusting, and balancing reports

  • Commissioning reports

  • Control drawings and BAS point lists

  • Filter and air-cleaner schedules

  • Boiler and hydronic design conditions

  • Ventilation calculations

  • Heating-load calculations

  • Current occupancy and operating schedules

  • Trend data from the previous heating season

  • Outstanding comfort and IAQ complaints

Compare current operation against the original basis of design. Buildings change over time. Tenant density increases, conference rooms become offices, storage rooms become occupied spaces, walls are reconfigured, and exhaust equipment is added without corresponding changes to makeup air.


The fall assessment should therefore verify both equipment readiness and continued design validity.


Recommended prefunctional data set

For each major air-handling system, record:

  • Total supply airflow

  • Outdoor airflow

  • Return airflow

  • Exhaust airflow associated with the system

  • Supply, return, mixed, and outdoor dry-bulb temperatures

  • Relative humidity or dew point

  • Supply and return static pressure

  • Filter differential pressure

  • Coil entering and leaving temperatures

  • Heating-water entering and leaving temperatures

  • Heating-water flow, when measurable

  • Damper command and actual position

  • Valve command and actual position

  • Fan command, speed, current, and status

  • Discharge-air temperature setpoint and actual value

  • Space temperature and humidity

  • Building differential pressure

Data should be collected under repeatable operating conditions, not only during an unoccupied visual inspection.


2. Verify Heating Capacity at the Air Side and Water Side

A boiler or furnace starting successfully does not prove that the HVAC system can deliver design heat to occupied zones. Capacity should be evaluated from measured air-side or water-side conditions.


Air-side heat output

For sensible heating calculations at standard air conditions:

Qs ≈ 1.08 × CFM × ΔT


Where:

  • Qs​ = sensible heat transfer, Btu/h

  • CFM = airflow, cubic feet per minute

  • ΔT = leaving-air temperature minus entering-air temperature, °F

  • 1.08 incorporates approximate standard air density and specific heat


For greater accuracy at nonstandard altitude, temperature, or density:

Qs = 60 × ρ × cp × CFM × ΔT


The measured capacity should be compared with the scheduled coil capacity and current heating load. If leaving-air temperature is acceptable but delivered heat is low, airflow may be insufficient. If airflow is correct but temperature rise is low, investigate water flow, valve position, entering-water temperature, coil fouling, air binding, or control limitations.


Hydronic heat output


For water-side heat transfer:

Qw ≈ 500 × GPM × ΔT


Where:

  • Qw​ = heat transfer, Btu/h

  • GPM = water flow, gallons per minute

  • ΔT = entering-water temperature minus leaving-water temperature, °F

  • 500 is an approximation based on water density and specific heat


For glycol systems, do not use 500 without correction. The fluid density and specific heat vary with glycol concentration and temperature:

Q = 60 × ρf × cp,f × GPM × ΔT


Where ρf​ and cp,fc​ are properties of the actual fluid mixture.

A low hydronic temperature difference can indicate excess flow, coil bypass, control-valve leakage, or low load. A high temperature difference accompanied by inadequate output may indicate insufficient flow, fouled strainers, air-bound coils, undersized valves, or inadequate pump differential pressure.


Boiler plant checks


For boiler systems, verify:

  • Burner modulation across the intended firing range

  • Flame-safeguard sequence

  • Combustion-air availability

  • Flue draft and vent condition

  • Gas pressure under load

  • Combustion efficiency and excess oxygen

  • Carbon monoxide in flue products

  • Supply- and return-water temperature sensors

  • Minimum flow through each boiler

  • Condensing-boiler return-water temperature

  • Pump rotation, flow, and differential pressure

  • Expansion tank charge and connection condition

  • Air separator and automatic vent operation

  • Low-water cutoff and high-limit operation

  • Lead-lag rotation

  • Isolation-valve position

  • Chemical treatment and glycol concentration


For condensing boilers, verify that the reset schedule permits sufficiently low return-water temperatures to support condensing operation when loads allow. A system designed for condensing performance can lose much of that benefit if the reset curve, bypass arrangement, minimum-flow sequence, or terminal-unit controls maintain unnecessarily high return temperatures.


Heat pumps and packaged rooftop units

For air-source heat pumps and packaged units, test:

  • Compressor operation in heating mode

  • Reversing-valve operation

  • Defrost initiation and termination

  • Outdoor-coil condition

  • Auxiliary heat staging

  • Balance-point logic

  • Low-ambient lockout

  • Discharge-air temperature control

  • Refrigerant pressures and temperatures

  • Condensate management during defrost

  • Crankcase heater operation, where applicable

  • Economizer and mechanical-heating interlocks


Trend compressor stages, outdoor-air temperature, discharge-air temperature, and auxiliary heat operation. Excessive electric resistance operation in mild weather frequently indicates a control, refrigerant, airflow, or defrost problem rather than an actual lack of heat-pump capacity.


3. Inspect Heat Transfer Surfaces and Quantify Fouling

Coil cleanliness directly affects heat transfer, pressure drop, airflow, and fan energy. Visual inspection alone may not reveal embedded fouling.

Compare:

  • Current coil air-pressure drop with clean-coil or design data

  • Current water-pressure drop with scheduled values

  • Airflow at the current fan speed with previous TAB results

  • Entering and leaving temperatures at stable load

  • Valve position relative to delivered capacity


A coil requiring nearly full valve position under moderate load may be suffering from reduced water flow, internal scaling, external fouling, low entering-water temperature, air binding, or control-sensor bias.


Inspect cooling coils even though cooling demand is declining. Residual moisture, blocked drains, carryover, or accumulated organic material can generate odors and provide conditions favorable to microbial growth. Drain pans should drain completely, and traps should be sized for the actual operating pressure at the drain connection.


For a draw-through unit, trap depth must overcome negative cabinet pressure. An improperly sized or dry trap can prevent drainage and allow air ingestion. For blow-through units, inadequate trap geometry can permit air and water to discharge through the drain line.


4. Analyze Filter Pressure Drop as Part of the Fan System

Filter replacement should be driven by measured pressure drop, system performance, manufacturer recommendations, and contaminant loading, not only by elapsed time.


For each filter bank, document:

  • Filter classification and dimensions

  • Face area

  • Face velocity

  • Initial pressure drop

  • Current pressure drop

  • Recommended final pressure drop

  • Evidence of bypass

  • Fan speed and airflow at the recorded condition

  • Installation date and accumulated operating hours


Filter face velocity is:
Vf = CFM / Af

Where:

  • Vf​ = filter face velocity, ft/min

  • Af​ = gross filter face area, ft²


Increasing filter area lowers face velocity and can reduce pressure drop while increasing dust-holding capacity. This is often a better engineering solution than simply installing a deeper or more efficient filter in an undersized rack.


Fan power is approximately related to airflow and total static pressure by:
BHP = CFM × ΔPt / 6356 × ηf

Where:

  • BHP = fan brake horsepower

  • ΔPt = total pressure rise, in. w.g.

  • ηf = fan efficiency


A filtration upgrade should be checked against available fan static pressure and motor capacity. On a variable-air-volume system, the control loop may compensate for added filter resistance by increasing fan speed, maintaining airflow but increasing energy use. On a constant-speed system, the same added resistance may reduce airflow and heating capacity.


ASHRAE notes that air-cleaning performance depends on contaminant type, airflow, distribution, operating principle, and correct application. It also cautions that technologies can affect energy, generate secondary consequences, and vary in the strength of supporting health-outcome evidence. [ashrae.org], [degreec.com]


5. Functionally Test Outdoor-Air and Economizer Systems

Fall creates favorable conditions for air-side economizer operation, but it also exposes failed sensors, leaking dampers, unstable mixed-air controls, and freeze-protection problems.


Do not validate an economizer by observing damper position alone. Perform a functional test across the applicable modes:

  1. Minimum outdoor-air mode

  2. Integrated economizer cooling

  3. Full economizer operation

  4. Mechanical cooling with economizer

  5. Heating mode

  6. Low-temperature limit or mixed-air reset

  7. Freeze-protection response

  8. Smoke or emergency control mode, where applicable


Confirm that damper command agrees with actual shaft position. Linkage slip, failed actuators, seized bearings, damaged blades, and failed position feedback can allow a BAS graphic to indicate normal operation while the physical damper remains closed or open.


Outdoor-air calculation by mass balance

Where temperature conditions are sufficiently separated and air streams are well mixed, the outdoor-air fraction may be estimated as:

XOA = TR − TM / TR−TO


Where:

  • XOA​ = outdoor-air fraction

  • TR​ = return-air temperature

  • TM​ = mixed-air temperature

  • TO​ = outdoor-air temperature


Then:

CFMOA = XOA × CFMSA


This method is sensitive to sensor accuracy, stratification, heat gain across the fan, and small temperature differences. Direct airflow measurement or tracer-gas methods may be more appropriate when high accuracy is required.


Intake contamination review

Inspect separation between outdoor-air intakes and:

  • Plumbing vents

  • Combustion exhaust

  • Loading docks

  • Vehicle queues

  • Emergency generators

  • Kitchen exhaust

  • Cooling towers

  • Refuse areas

  • Sanitary exhaust

  • Process exhaust

  • Standing water and roof drains

The applicable mechanical code and adopted version of ASHRAE Standard 62.1 should govern minimum separation and intake placement. The 2025 edition includes revised calculation methods for separation distances and exhaust airflow, so an engineer should not assume that a previous rule of thumb remains applicable.


6. Verify Space Pressurization

Pressure relationships strongly influence odor migration, moisture entry, infiltration, and contaminant transport.


Measure differential pressure across:

  • Building envelope

  • Vestibules

  • Restrooms

  • Janitor closets

  • Kitchens

  • Laboratories

  • Isolation or treatment rooms

  • Mechanical rooms

  • Parking-garage interfaces

  • Loading areas

  • Chemical-storage rooms


Building pressure can be approximated by the air balance:
Qpress = QOA − QEA − Qrelief

However, measured pressure depends on envelope leakage, wind, stack effect, door position, shaft leakage, and internal partitioning. A positive airflow balance does not guarantee positive pressure at every floor or façade.


During cold weather, stack effect can produce positive pressure near upper floors and negative pressure near lower floors. Excessive positive pressure can force warm, moisture-laden indoor air into cold envelope assemblies, creating condensation. Excessive negative pressure can pull in cold air, odors, vehicle exhaust, and moisture through uncontrolled pathways.


7. Review Heating-Season Humidity and Dew Point


Relative humidity alone can be misleading because it changes with temperature. Dew point is often more useful for evaluating condensation risk.

Key locations include:

  • Exterior walls and glazing

  • Roof-to-wall transitions

  • Supply-air ducts in unconditioned spaces

  • Cold-water piping

  • Outdoor-air mixing sections

  • Vestibules

  • Building entrances

  • Data or telecommunications rooms

  • Perimeter zones


Humidification systems should be inspected for:

  • Absorption distance

  • Steam dispersion quality

  • Duct wetting

  • High-limit humidistat function

  • Interlocks with fan proof and airflow

  • Valve leakage

  • Water quality

  • Canister or electrode condition

  • Drain and flush operation

  • Sensor calibration


Establish humidity limits with reference to envelope capability, climate, occupancy, process needs, and condensation risk. A fixed high indoor-relative-humidity target can be inappropriate during very cold weather if the envelope cannot tolerate the corresponding indoor dew point.


8. Recommission the Control Sequences

Fall changeover is an ideal time for focused retrocommissioning. Review trend data for:

  • Simultaneous heating and cooling

  • Excessive discharge-temperature reset

  • Persistent heating-valve leakage

  • VAV boxes at minimum airflow with reheat active

  • Outdoor-air dampers open during unoccupied periods

  • Failed occupancy schedules

  • Morning warm-up with outdoor-air dampers open unnecessarily

  • Supply static pressure above requirement

  • Boiler hot-water setpoints that do not reset

  • Short cycling

  • Unstable mixed-air temperature

  • Excessive override duration

  • Economizer operation outside allowable conditions


Morning warm-up

A typical morning warm-up sequence may:

  1. Start the air-handling system before occupancy.

  2. Close or reduce outdoor-air dampers where permitted.

  3. Drive heating to recover zones to occupied setpoint.

  4. Terminate warm-up based on representative zone temperature or calculated recovery.

  5. Restore minimum ventilation before occupancy.

  6. Enable normal discharge-air and static-pressure reset.


The exact sequence must conform to the adopted ventilation standard, code requirements, occupancy schedule, and building use. Healthcare, laboratory, industrial, and continuously occupied facilities may not permit the same reduction in outdoor airflow used in a conventional office.


Sensor calibration

Verify critical sensors against traceable or recently calibrated instruments. Prioritize:

  • Outdoor-air temperature and humidity

  • Mixed-air temperature

  • Supply-air temperature

  • Heating-water supply and return temperature

  • Space humidity

  • Duct static pressure

  • Building differential pressure

  • Filter differential pressure

  • Carbon dioxide

  • Carbon monoxide, where installed


A small sensor bias can have a disproportionately large effect. For example, a mixed-air temperature sensor reading several degrees high may drive the outdoor-air damper farther open, increasing heating load and freeze risk.


9. Treat IAQ as a Mass-Balance Problem

The engineering foundation of IAQ is contaminant generation, removal, dilution, transport, and deposition.


For a well-mixed zone at steady state, a simplified contaminant balance is:
Ci = Co + G / Qeff​

Where:

  • Ci = indoor concentration

  • Co​ = outdoor concentration

  • G = indoor contaminant generation rate

  • Qeff​ = effective contaminant-free airflow or removal rate


A more complete analysis may include outdoor-air ventilation, filtered recirculation, air-cleaner removal, deposition, interzone transfer, and contaminant decay.

The correct control strategy depends on the contaminant:

Contaminant category

Primary engineering responses

Carbon dioxide and occupant bioeffluents

Occupancy control and outdoor-air ventilation

PM2.5, smoke, pollen and dust

Source control, envelope control, particulate filtration and air cleaning

VOCs and odorous gases

Source control, ventilation and contaminant-specific molecular filtration

Carbon monoxide

Eliminate combustion or exhaust source, ventilate, alarm and investigate

Moisture and mold

Correct water source, dry materials and control humidity

Infectious aerosols

Outdoor air, filtered recirculation, air cleaning, distribution and operational planning

Ammonia, amines or acid gases

Source control and contaminant-specific chemisorptive media

This is why one IAQ device should not be expected to solve every indoor-air problem.


10. Establish a Defensible IAQ Measurement Plan


An engineer-facing IAQ investigation should define:

  • Contaminants of concern

  • Measurement method

  • Instrument range and accuracy

  • Calibration requirements

  • Sample location and height

  • Outdoor reference measurements

  • Occupancy state

  • HVAC operating mode

  • Averaging period

  • Alarm level

  • Corrective action

  • Post-correction verification


Common measurements include:

  • PM1, PM2.5 and PM10

  • Carbon dioxide

  • Carbon monoxide

  • Temperature

  • Relative humidity

  • Dew point

  • Total VOC indication

  • Contaminant-specific VOCs

  • Formaldehyde

  • Ozone

  • Differential pressure

  • Outdoor airflow

  • Filter pressure drop


Low-cost sensors can be useful for trends, fault detection, and comparative measurements, but they may not be adequate for compliance decisions or contaminant-specific exposure assessments. Total-VOC sensors also should not be treated as a substitute for identifying individual compounds.


The U.S. Environmental Protection Agency identifies source control, improved ventilation, and air cleaning or filtration as the three basic IAQ strategies. Source control is generally the first priority because dilution or air cleaning may be less effective and more energy intensive when an active source remains.


11. Engineering GPS Air Solutions into the HVAC System

GPS Air offers soft-ionization, filter-enhancement, and sensor-controlled air-cleaning products for commercial applications. Product selection should be tied to airflow, equipment type, contaminant objective, safety certification, electrical requirements, BAS integration, and documented test conditions.


NPBI and soft ionization

The manufacturer describes needlepoint bipolar ionization as a process that introduces positive and negative ions into the airstream. These ions are intended to interact with particles, promote agglomeration, enhance capture by downstream filtration, and reduce certain odors and microorganisms. The performance of any ionization application should be evaluated using product-specific data and realistic airflow, residence time, duct geometry, filtration, and space-distribution conditions.


Engineering review items


Before specification, confirm:

  • Scheduled system airflow

  • Minimum and maximum airflow

  • Installation location

  • Air velocity at the emitters

  • Distance to downstream components

  • Access for inspection

  • Power supply

  • Interlock with fan operation

  • Alarm contacts

  • BAS monitoring

  • Temperature and humidity limits

  • Product-specific UL listings

  • Ozone-emission certification

  • Test method used for performance claims

  • Effect of downstream filtration

  • Commissioning method


Where ionization is selected, specify a product certified to UL 2998 for zero ozone emissions and verify certification for the exact model. UL 2998 certification addresses ozone emissions, not overall contaminant-removal efficacy. GPS Air states that its current products are certified to UL 2998 and that this validation corresponds to an ozone-emission threshold below 5 ppb.


Example: CI-2 application

The CI-2 is identified by the manufacturer for fan coils, PTACs, mini-splits, ceiling cassettes, split systems, and air handlers up to 2,400 CFM. Published specifications include 24 VAC or 12–36 VDC standard input, 4 W normal power consumption, an automatic cleaning cycle, and a normally open dry contact for status monitoring. The published operating range is −20°F to 140°F, with product listings including UL 867, UL 2998, UL 2043, and CARB compliance. These values should be verified against the latest project submittal.


A fall inspection of an NPBI installation should verify:

  • Device power

  • Fan interlock

  • Fault-contact operation

  • Emitter condition

  • Correct orientation

  • Secure mounting

  • No visible contamination

  • Automatic cleaning operation

  • BAS alarm reporting

  • Downstream filter condition

  • Post-installation particle trends


The engineer should avoid specifying an arbitrary ion concentration in the occupied zone unless the manufacturer provides a validated design method that connects the measurement to performance and safety.


GPS filter enhancement

GPS Air offers PF-i and PF-e filter-enhancement products using its Opti-Lok technology. The manufacturer states that these products are intended to improve capture of fine and ultrafine particles and that its proprietary MERV 11 filter used with Opti-Lok can provide removal performance identified as equivalent to a standard MERV 13 filter. Engineers should request the complete test report, face velocity, loading condition, particle-size data, pressure drop, and configuration before assigning equivalent performance in design calculations.


This distinction is important: an enhancement claim does not necessarily change the base filter’s formal MERV classification unless tested and reported under the applicable standard in the final configured assembly.


GPS smartIAQ and IAQP applications

smartIAQ combines filtration, air cleaning, integrated sensors, and closed-loop control. GPS Air offers distributed, centralized, and performance configurations, with the centralized model designed for side-stream connection to air-handling units or rooftop units. Published features include air-quality logging, filter-life indicators, BACnet or Modbus communication, and product testing or compliance references including UL 867, UL 2998, ASHRAE 52.2, and ASHRAE 145.2.


The platform may be considered as part of an Indoor Air Quality Procedure design under ASHRAE Standard 62.1. Under the IAQP, the engineer evaluates indoor and outdoor sources, design compounds, PM2.5, design limits, air-cleaner performance, and outdoor airflow through contaminant mass-balance calculations. It is not simply a general authorization to reduce outdoor air after installing an air cleaner.


An IAQP design should include:

  1. Identification of applicable design compounds.

  2. Indoor and outdoor source rates.

  3. Design concentration limits.

  4. Air-cleaner removal efficiency for each applicable contaminant.

  5. Airflow and contaminant mass-balance calculations.

  6. Minimum required outdoor airflow.

  7. Product-specific third-party test data.

  8. Sensor and control requirements.

  9. Operation and maintenance requirements.

  10. Post-installation verification.

  11. Documentation for the authority having jurisdiction.

  12. A fallback mode if the air cleaner or monitoring system fails.


Because standards and codes are continually maintained, the engineer should use the edition adopted by the authority having jurisdiction and account for approved addenda. ASHRAE published Standard 62.1-2025 after the 2022 edition, and a project may still legally reference an earlier adopted edition.


12. Engineering Purafil Molecular Filtration

Particulate filtration does not adequately remove most gases and vapors. Molecular contaminants are orders of magnitude smaller than the particles addressed by conventional HVAC filters and require adsorption, absorption, or chemical reaction.


Purafil provides molecular filtration media and equipment intended for gaseous contaminants, odors, corrosion control, and toxic-gas applications. Its media portfolio includes activated carbon, impregnated chemisorptive media, blends, and contaminant-specific products.


Adsorption versus chemisorption

Activated carbon primarily removes many gaseous contaminants through physical adsorption onto a high-surface-area material. Performance depends on:

  • Contaminant chemistry

  • Molecular weight

  • Concentration

  • Temperature

  • Relative humidity

  • Competing contaminants

  • Media mass

  • Bed depth

  • Residence time

  • Air velocity


Chemisorptive media use adsorption, absorption, and chemical reaction to convert target gases into materials retained within the pellet. Purafil describes its process as an irreversible conversion in which reaction products remain trapped in the media.


Media residence time

The relationship between media volume and airflow may be expressed as:

tc = Vm / Q​​


Where:

  • tc = nominal contact time

  • Vm​ = media-bed volume

  • Q = airflow rate


Higher airflow through the same media volume reduces contact time and may reduce single-pass removal efficiency. Pressure drop and bypass leakage must also be included in the design.


Media selection by contaminant


Purafil identifies several media families:

  • Activated carbon pellets: Broad removal of certain odorous VOCs, outdoor pollutants, and acid gases.

  • CP Blend: Chemisorbant and activated carbon for a broader range of gaseous contaminants.

  • Puracarb: Intended for chlorine, hydrogen sulfide, and sulfur dioxide.

  • Puracarb AM: Intended for ammonia, amines, and similar base gases.

  • OdorCarb Ultra: Intended primarily for hydrogen sulfide.

  • SP Blend: Used in combination odor and particulate filtration products.


Media should not be selected by odor description alone. “Chemical smell,” “musty,” and “sewer odor” are observations, not contaminant identifications. Where the source is unclear or consequences are significant, obtain compound-specific sampling or engage the manufacturer’s laboratory services.


Purafil Side Access systems

The Purafil Side Access, or PSA, is designed for integration with new or existing HVAC systems and can be configured for particulate and gas-phase contaminant control. It may be appropriate where a central air handler requires a substantial media bed, service access, or multiple filtration stages.


Engineering considerations include:

  • Design airflow and face velocity

  • Media-bed depth

  • Required residence time

  • Initial and final pressure drop

  • Prefilter efficiency

  • Final particulate filtration

  • Housing leakage

  • Service-clearance requirements

  • Media-module weight

  • Disposal requirements

  • Corrosion-resistant construction

  • Differential-pressure monitoring

  • Media sampling ports

A particulate prefilter is typically important because dust loading can block gas-phase media surfaces and increase pressure drop.


Advanced Odor Control PuraFilter

The Advanced Odor Control PuraFilter combines particulate filtration with SP Blend molecular media. The manufacturer positions it for odor and gaseous-pollutant removal where a relatively low-pressure-drop, combination filter is appropriate.


For an engineering specification, require:

  • Dimensions and effective media area

  • Initial pressure drop at scheduled airflow

  • Recommended final pressure drop

  • Molecular-media mass

  • Target-contaminant test data

  • Test airflow and challenge concentration

  • Expected service life under project conditions

  • Particulate efficiency

  • Moisture and temperature limits

A combination filter may be a practical retrofit, but its relatively limited molecular-media mass may not be appropriate for high contaminant loading or long required service life.


PuraGRID

PuraGRID is designed to provide a larger quantity of chemical filtration media with relatively low airflow resistance. Different media can be selected for the project’s contaminants.


This solution may be useful where molecular capacity is required but the available fan-static-pressure budget is limited. The engineer should still evaluate the entire dirty-filter condition, because low initial pressure drop does not eliminate pressure-drop growth caused by particulate loading, media settling, or upstream filter failure.


Interpreting ASHRAE 145.2 data

ASHRAE Standard 145.2 establishes a full-scale laboratory test method for in-duct sorptive-media gas-phase air-cleaning devices. The test is performed at specified airflow and elevated challenge concentrations under controlled conditions. Results are useful for comparing devices, but they should not be assumed to directly predict service life or field performance at much lower real-world concentrations.


For each target gas, request:

  • Initial single-pass removal efficiency

  • Efficiency over the test period

  • Challenge concentration

  • Airflow and face velocity

  • Temperature and humidity

  • Media quantity

  • Pressure drop

  • Breakthrough behavior

  • Test duration

  • Test laboratory

  • Device configuration


Single-pass efficiency is:
ηg = Cup − Cdown \ Cup​

Where:

  • ηg​ = gas-removal efficiency

  • Cup​ = upstream concentration

  • Cdown​ = downstream concentration


For recirculated airflow, the theoretical clean-air contribution may be estimated as:

Qclean = Qr × ηg​


This simplified relationship is contaminant-specific and assumes the reported efficiency remains applicable at the actual flow, concentration, humidity, and media condition.


13. Prepare for Infectious-Aerosol Operation

ASHRAE Standard 241 addresses control of infectious aerosols in new and existing buildings. It establishes an Infection Risk Management Mode, equivalent clean airflow requirements, air-cleaner performance and safety considerations, and building-readiness planning.

Equivalent clean airflow represents the combined effect of outdoor air, filtered recirculated air, and other air-cleaning or inactivation technologies: QECA = QOA + ηfQr + QAC

Where:

  • QECA​ = equivalent clean airflow

  • QOA​ = outdoor airflow credited as contaminant-free for the analysis

  • Qr​ = recirculated airflow

  • ηf​ = filter efficiency for the particle size of concern

  • QAC​ = equivalent clean-air contribution from other validated air-cleaning technologies

This is a conceptual expression. Actual compliance should follow the equations, target values, safety criteria, and documentation in the adopted standard.


A fall readiness plan should identify how the facility would increase equivalent clean airflow during an elevated-risk period. Possible measures include:

  • Increasing outdoor airflow within heating capacity

  • Raising fan speed

  • Improving central filtration

  • Activating supplemental air cleaning

  • Deploying in-room units

  • Extending HVAC operating hours

  • Disabling demand-controlled ventilation reductions

  • Monitoring filter pressure drop

  • Verifying room air mixing

  • Implementing a documented Building Readiness Plan

ASHRAE emphasizes that Standard 241 addresses design, installation, commissioning, operation, and maintenance and requires facilities to plan for operation during identified periods of elevated infectious-disease risk.


14. Commission GPS Air and Purafil Equipment as Systems

Neither ionization nor molecular filtration should be considered commissioned merely because equipment is installed and energized.


GPS Air commissioning

Document:

  • Product model and serial number

  • Serving-system airflow

  • Installation location

  • Electrical supply

  • Fan interlock

  • Alarm-contact operation

  • BAS point mapping

  • Automatic-cleaning sequence

  • Product status

  • Filter type and pressure drop

  • Baseline particulate concentrations

  • Post-installation particulate trends

  • Applicable ozone-emission certification

  • Required maintenance


Purafil commissioning

Document:

  • Equipment model

  • Media type and batch

  • Media quantity

  • Target contaminant

  • Fan airflow

  • Face velocity

  • Initial pressure drop

  • Housing leakage

  • Prefilter and final-filter installation

  • Upstream and downstream gas concentration

  • Initial removal efficiency

  • Sampling locations

  • Media-life monitoring method

  • Replacement and disposal procedure


For both technologies, verify operation at minimum and maximum system airflow. Variable-air-volume systems can produce very different velocities and contact times across the operating range.


15. Recommended Fall Functional Performance Tests

A complete fall readiness program should include witnessed functional tests, not just preventive maintenance work orders.


Heating-system test

  • Command heating enable.

  • Confirm pump and boiler staging.

  • Verify valve modulation.

  • Measure air-side or water-side capacity.

  • Confirm zone response.

  • Test safeties and alarms.

  • Verify reset schedules.


Economizer test

  • Simulate outdoor-air conditions.

  • Verify minimum position.

  • Command economizer operation.

  • Confirm damper movement and feedback.

  • Verify mechanical cooling integration.

  • Test low-limit and freeze protection.

  • Confirm return to normal operation.


Ventilation test

  • Place system in occupied mode.

  • Measure outdoor airflow.

  • Verify zone occupancy inputs.

  • Test demand-control ventilation.

  • Confirm minimum airflow limits.

  • Test sensor-failure fallback.


Building pressure test

  • Measure pressure with exterior doors closed.

  • Observe elevator and exhaust effects.

  • Test representative low and high floors.

  • Confirm restroom and process-room relationships.

  • Repeat under representative wind conditions if necessary.


IAQ-system test

  • Verify sensors and calibration.

  • Simulate elevated contaminant readings.

  • Confirm air-cleaner response.

  • Confirm BAS alarm and trend logging.

  • Verify fan interlocks.

  • Confirm failure-mode operation.

  • Document recovery to normal mode.


16. Final Engineering Checklist


Air-handling equipment

  • Verify total, outdoor, return, and exhaust airflow.

  • Record clean and loaded filter pressure drop.

  • Inspect coils and measure pressure drop.

  • Confirm drain-pan slope and trap operation.

  • Test damper movement and feedback.

  • Trend discharge-air temperature control.

  • Check fan operating point and available static pressure.


Heating plant

  • Conduct combustion analysis where applicable.

  • Verify boiler and pump staging.

  • Test safeties.

  • Measure water-side temperature difference.

  • Confirm glycol concentration and freeze point.

  • Inspect expansion and air-management systems.

  • Verify reset schedules and condensing operation.


Controls

  • Calibrate critical sensors.

  • Remove expired overrides.

  • Review alarm routing.

  • Confirm occupancy schedules.

  • Test morning warm-up.

  • Verify economizer lockouts.

  • Identify simultaneous heating and cooling.

  • Confirm sensor-failure fallback modes.


IAQ

  • Identify contaminants before selecting treatment.

  • Inspect outdoor-air intakes and indoor sources.

  • Verify particulate-filter efficiency and pressure drop.

  • Evaluate gas-phase filtration for odors and VOCs.

  • Verify UL 2998 certification for ionization products.

  • Trend PM2.5, carbon dioxide, humidity, and pressure where relevant.

  • Develop elevated-risk operating sequences.

  • Document air-cleaner maintenance and replacement criteria.


Conclusion: Use Fall Changeover as a Mini-Recommissioning Event

The most effective fall HVAC preparation program treats seasonal startup as a focused recommissioning effort. The objective is not merely to prove that heating equipment operates, but to verify that the complete system delivers required heat, airflow, ventilation, pressure control, filtration, and contaminant removal under actual operating conditions.


A technically defensible IAQ strategy should follow a clear hierarchy:

  1. Identify and control contaminant sources.

  2. Correct moisture, drainage, and combustion problems.

  3. Deliver and verify required outdoor airflow.

  4. Provide appropriate particulate filtration.

  5. Use GPS Air solutions where validated soft ionization, filtration enhancement, or closed-loop air cleaning aligns with the design objective.

  6. Use Purafil molecular filtration where gases, vapors, VOCs, ammonia, sulfur compounds, corrosion, or persistent odors are the concern.

  7. Commission every device under actual airflow and control conditions.

  8. Monitor performance and establish failure-response procedures.


The final measure of success is not that a device has been installed or a maintenance ticket has been closed. It is that the building can demonstrate stable temperature control, code-compliant ventilation, appropriate humidity, reliable pressure relationships, measurable contaminant reduction, and documented readiness for winter operation.

 
 
 

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

Contact

Thanks for submitting!

Lexington Office

680 Bizzell Dr. Lexington, KY 40510

859.255.9665​

 

Louisville Office

13151 Middletown Industrial Blvd, Louisville, KY 40223

502.473.0829​

 

Paducah Office

115 Eaglet Cove, Paducah, KY 42003

​270.898.6976

  • Facebook
  • LinkedIn
bottom of page